This project intends develop numerous concept channel treatment alternatives at the request of the San Francisco Regional Water Quality Control Board (Water Board). The Water Board’s involvement resulted in additional bio-engineered slope treatments to reduce the quantity and size of rock in the restored channel.
PROJECT TIMELINE
March 2026
Completed design.
May 2026
Bid Advertise.
July 2026
Bid Award.
August 2026
Construction Start.
Summer 2027
Construction End.
ADDITIONAL INFORMATION
Project Manager: Mike Owyang Project Phase: Design Project Category: Storm Drainage and Watershed Improvements Project Location: Library Drive Neighborhood: Fairmede/Hilltop City Council District: 4